Skip to Main Content
Ride on roller compacting fresh asphalt near the entrance of a Daytona Beach, Florida apartment complex, with the paver at the left and a two story building with a wooden stair tower behind

Apartment Parking Lot Paving Around the StairsDaytona Beach, Florida

Parking lot asphalt paving at a Daytona Beach apartment complex, milled and repaved around two story buildings, stair towers and a long run of sidewalk. All three photos on this page were taken while the crew was working.

Project at a glance

Location
Daytona Beach, Volusia County
Property
Two story apartment complex
Scope
Milling and parking lot paving
Equipment
Paver, ride on roller and hand tools

The Milling

Why mill an apartment parking lot before repaving it?

Milling keeps the finished lot at the right height. Paving straight over old asphalt raises the surface every time, and on an apartment lot that extra height has nowhere to go.

Look at the curb in this photo. The yellow painted edge still stands above the new mat, which is exactly where it should sit. Skip the milling, add two inches on top, and that curb shrinks. Water that used to run along it starts spilling onto the sidewalk and toward the ground floor doors. To the right, the milled surface is still rough and gray, and the paver is already loaded and rolling toward it.

The rough texture is on purpose. It gives the new asphalt something to grab. The ground up material does not go to waste either, since millings make a firm base or a driveway cover. Our page on recycled asphalt millings explains how that works.

During paving: fresh black asphalt laid along a yellow painted curb at a Daytona Beach apartment complex, with the milled gray surface still waiting on the right and the paver loaded with hot mix
During: new mat beside milled lot

Hand Work

How do you pave tight against sidewalks and stair landings?

By hand. The paver handles the open stretches, but the last few inches along a sidewalk belong to the crew with rakes and lutes.

In this frame two of our crew pull hot mix into the edge where the stalls meet the walkway. One rakes. The other drags a lute to level what the rake leaves behind. A red pickup and an equipment trailer sit in the background, and the paver waits down by the far building.

That edge matters more at an apartment complex than almost anywhere else. Residents step off the sidewalk carrying groceries, pushing strollers and hauling laundry, and a lip of even half an inch catches a toe. Stair towers make it harder, because the landings come down close to the parking stalls and leave little room to swing a machine. Hand work is slower. It is also the part people notice every single day. At M&S Asphalt Paving, we plan the hand crew into every multifamily job, and our commercial asphalt paving page covers how we scope them.

During paving: two crew members raking and luting hot asphalt into the edge beside a sidewalk at a Daytona Beach apartment complex, with a red pickup and trailer behind them
During: hand work at the sidewalk

The Entrance

How do residents keep parking while their lot is repaved?

We pave in sections. One row of stalls closes while the rest stays open, and the entrance goes last so nobody gets trapped inside.

This is that last stretch. The ride on roller works the fresh mat near the entrance drive while the paver finishes the edge at the left. Behind them stands one of the two story buildings with its wooden stair tower, the kind of building this whole complex is made of. Look at the roller marks. The passes overlap tightly, and the roller keeps going until the surface stops moving under the drum.

Before any section closes, the property manager gets the schedule, so notices can go on doors ahead of time. That one step heads off most of the phone calls. Daytona Beach has a lot of older garden style complexes like this one, many with stair towers set right at the parking line. If you manage one, our asphalt paving in Daytona Beach page covers the work we do around the city.

During paving: ride on roller on fresh asphalt near the entrance of a Daytona Beach, Florida apartment complex, with the paver finishing the edge at the left and a two story building with a wooden stair tower behind
During: finishing the entrance

Want to see another Daytona Beach apartment lot?

This apartment lot was repaved in sections, with the new asphalt tied into the storm drain so water leaves the stalls.

Managing an apartment lot that needs repaving?

Call and tell us about the property. We walk the lot, look at the curbs, the drains and how residents move through it, then give you a straight price with the section plan written out, in English or Spanish.

Call us today (386) 215-7466

Get a Free Estimate