M&S Asphalt Paving dump truck parked beside the paver as a new strip of asphalt goes down along a planting bed in a DeBary, Florida parking lot

Parking Lot Asphalt Paving, Strip by StripDeBary, Florida

A large parking lot in DeBary, gray and cracked edge to edge, repaved one long strip at a time. As the paving contractor, we ran our own trucks and paver on the job. Every photo here was taken before or during the work, and each one is labeled.

Project at a glance

Location
DeBary, Volusia County
Property
Large lot at an older building
Scope
Full parking lot paving
Equipment
Paver, dump trucks, rollers and track loader

Before

How can you tell a parking lot needs repaving, not patching?

When the cracks connect. Single cracks get filled. A surface broken into a web of blocks, like this one, has lost what held it together.

This is the lot the morning we arrived. The asphalt has faded to a pale gray, the stall lines are nearly gone, and the cracking runs from one edge to the other. Our two rollers and the track loader sit in the shade of the live oaks at the left, staged out of the way of the first pass.

The gray color is the clue most owners miss. New asphalt is black because of the liquid asphalt binder in the mix. Years of Florida sun bake that binder out of the top layer, the surface turns brittle, and rain starts finding the cracks. Once water reaches the base, crack filling and sealcoat buy a little time and not much more. Our asphalt repairs page explains where that line sits, and when a repair still makes sense.

Before paving: wide, faded gray parking lot in DeBary, Florida with a web of cracks, and two rollers and an orange track loader staged under live oaks
Before: the old lot

The Strips

Why do paving crews lay a parking lot in long strips?

Because a paver lays one width at a time. A big lot is really a series of passes, and the quality lives in how each pass meets the next.

Here a dump truck waits at the head of the lot while the paver works with its hopper heaped full of hot mix. A roller follows down the finished strip in the background. Each truck backs in, tips its load and pulls away, and the next one has to be ready, because a paver that stops and restarts leaves a bump you can feel in a car.

The seam between two strips is called a joint. Done right, the second pass overlaps the first slightly, the crew rakes the extra back, and the roller presses both edges together while they are still hot. Done wrong, the joint becomes the first crack in the new lot. As a commercial asphalt paving contractor, we plan the passes before the first truck shows up.

During paving: dump truck waiting at the head of a DeBary parking lot while the paver works with a hopper full of hot asphalt and a roller follows on the new strip
During: feeding the paver

Hiring

What should you ask a parking lot paving contractor in DeBary?

Ask who owns the trucks. A contractor that hires out the hauling works on someone else's schedule, and the paver sits idle while everyone waits.

The white truck with the red bed in this photo carries our name on the door. It is parked beside the paver while the next strip goes down along the planting bed. Owning the trucks means the mix arrives when the paver needs it.

Then ask about thickness and warranty, and get both in writing. Our standard is two inches of asphalt with a one year material warranty, and a lot laid that way gives 10 to 15 years of surface life. DeBary lots often sit under heavy oak canopy, and that shade keeps pavement damp long after a storm, so ask how the contractor plans the drainage around it. Our asphalt paving in DeBary page covers more of the city. At M&S Asphalt Paving, every quote spells out the scope line by line.

During paving: M&S Asphalt Paving dump truck parked beside the paver as a new strip of asphalt goes down along a planting bed in a DeBary, Florida parking lot
During paving

On the Job

What did the lot look like as the work moved along?

Three more frames from the same job, in order. None of them shows the finished lot, and each caption says what stage you are looking at. Look for the line where new black asphalt meets the old gray surface. That edge is where the next strip ties in.

Before paving: far end of a cracked DeBary parking lot beside a chain link fence, with rollers and a track loader staged under the trees
Before: the far end of the lot along the fence, with the equipment staged under the trees.
During paving: first strip of new black asphalt running down the side of a DeBary parking lot as two crew members walk its edge
During: the first strip down, with two of the crew walking its edge and the paver hopper loaded at right.
During paving: side section of a DeBary parking lot paved in new asphalt next to the unpaved main lot by a chain link fence
During: the side lot paved, with the main section still waiting its turn.

Want to see another DeBary parking lot?

At this DeBary apartment complex, the crew raked, luted and rolled every pass by the sidewalk.

Is your parking lot gray, cracked and past patching?

Call and tell us about the lot. We walk it, look at the cracks, the base and the drainage, then give you a straight price with the scope written out, in English or Spanish.